Projects
![]()
1998-1999 Technical Audit, Report and Database of Pressure Equipment & Lifting Equipment – Water Service NI, with multiple site visits, technical reports and construction of a MS access Database.
1999 – 2005 Design & Installation of CO₂/N₂ Cylinder Filling Plant (3) – BOC Gases Ireland, operating at 200 and 230 Bar.
2002 COMAH Scaled Risk Integral Exercise – Port Talbot – Welsh Development Agency
2003 Steam Boiler Economizer – John Thompson & Sons, Installation and project co-ordination
2002 - 2004 Design & Project Supervision LPG Pipeline & Mercaptan Dosing Plant – DCC (Flogas)
2003 - Onwards Expert Witness Reports
2004 – 2008 Long Term Reliability Study of Gas Generation and Mixing in the Irish pub Trade – BOC Gases
2005 – 2006 COMAH Hazard Management Study – Honeywell Iropharm (now Sigma-Aldrich Fine Chemicals)
2005 – 2008 Design, Development and Installation of 300 Bar Medical Oxygen Filling – BOC Gases
2007 – 2009 Design, Development and Installation of Helium Transfer Plant – BOC Gases
Smaller Scale Projects
Predictive Noise Studies for Planning Applications
ISO 14000 Preparatory Reviews (Audits)
Technical Reports